Skip to content Skip to footer

Project Overview

Client: Ashghal
Consultant: AECOM
Contractor: Leighton Contracting and Al Jabor Engineering
Solution Deployed: HD Live Camera and Time-Lapse System

Challenges

  1. Remote Location:
    The project site was in a remote area, with little to no reliable internet coverage. This posed a significant challenge in maintaining consistent camera connectivity for live streaming and time-lapse recording.
  2. Internet Connectivity Across 30 km:
    The vastness of the project area required a solution to extend internet access over 30 kilometers.
  3. Solar Power Dependency:
    The lack of electrical infrastructure necessitated a fully reliable solar-powered system.
  4. Camera Tower Stability:
    The extreme wind conditions in the open desert environment required the construction of a high, wind-resistant camera tower.
  5. Industrial-Grade Durability:
    The harsh environmental conditions, including high temperatures and dust, demanded equipment capable of withstanding industrial-grade wear and tear.

Solutions Implemented

  1. P2P Multipoint Wi-Fi Network:
    • Designed and implemented a Point-to-Point (P2P) multipoint Wi-Fi solution to provide internet connectivity.
    • Internet was sourced from the site office and extended to the 30-kilometer project radius, ensuring uninterrupted live streaming and data uploads.
  2. Solar Power Integration:
    • Installed solar-powered systems for each camera, ensuring uninterrupted operation without reliance on grid power.
  3. Custom Camera Tower Construction:
    • Constructed a 28-meter-high camera tower with precise engineering and wind-resistance calculations.
    • The tower was designed to withstand strong desert winds and maintain camera stability for high-quality images and live feeds.
  4. Industrial-Grade Equipment:
    • Deployed IP66-rated components for all hardware, ensuring protection against dust and water ingress, along with durability in extreme temperatures.

Outcome

  • Reliable Monitoring: The HD live camera and time-lapse systems provided Ashghal, AECOM, and contractors with consistent, high-resolution visuals for monitoring project progress remotely.
  • Enhanced Connectivity: The P2P multipoint Wi-Fi solution delivered stable internet across the entire project area, solving the connectivity issue efficiently.
  • Sustainability: Solar-powered systems reduced the carbon footprint of the project while ensuring continuous operation.
  • Safety and Stability: The custom-built, wind-resistant tower ensured high performance and durability, minimizing maintenance needs.
  • Improved Collaboration: The solution enabled stakeholders to access live and archived visuals, fostering better decision-making and collaboration.

This case highlights Widelapse’s commitment to providing innovative and sustainable solutions for complex and large-scale projects, meeting client needs with precision and reliability.